Woodward Group delivered a bespoke production solution for the process of taking wooden timbers and panels 888 casino reviewon their journey throughout the production pipeline of its modular home construction. Our ability to be highly flexible, responsive, creative and forward-thinking was central to the successful completion of the project.

CLIENT:

Top Hat Industries


SECTOR:

Production


PROJECT:

Factory fit-out to incorporate production line control solution, and fire and security services.


BUDGET:

£900,000


WOODWARD DIVISION:

Company wide


REQUIREMENT:

To deliver and install a fully automated production line solution for its modular homes construction facility that has become 888 casino slotsone of the emerging home build modular manufacturing sector’s leading sites.


PROCESS:

Tender 


BACKGROUND:

Top Hat specialises in the construction of wooden, modular homes. It identified the requirement for a bespoke production solution for the process of taking wooden timbers and panels 888 casino reviewon their journey throughout the production pipeline of its modular home construction.

Top Hat first conducted scoping due diligence on Woodward Group, and then scheduled a series of meetings to discuss the design of the system, along with its safety, practicality, efficiency and innovation features.


SOLUTION & OUTCOMES:

Woodward Group designed and installed the bespoke 888 casino loginsystem that, as expected, included several evolving modifications along the way to maximise performance., as our team was working without a blueprint since modular homes are in their infancy. The Woodward Group’s ability to be highly flexible, responsive, creative and forward-thinking was vital to the successful completion of the project.

Along with our partners on the project (Industrial Controls and Automation Ltd), we provided a fully operational home build factory, with numerous of our services including:

  • Design consultation
  • Project management
  • 888 casino reviewComplete process installation
  • Panel build design, installation and commission
  • Safety system installation
  • Electrical installation
  • LV infrastructure
  • Network infrastructure
  • Fire alarm system
  • Intruder alarm system
  • LED lighting installation
  • Emergency lighting compliant installation
  • Plant and site temporary hire
  • IT installation
  • Water and waste system installation